If the final failed and the machine has high hours, the rest of the axle is already wearing. Replace the whole assembly while you’re in there.
Smart fleet managers swap axles at scheduled intervals — not after a failure shuts down a job site.
One part number. One install. No piecing it together at 11pm with a truck on jack stands.
The final-drive bench turns out rebuilt finals daily. The differential bench has stock on the shelf. Banjo housings come in prepped from our machine work.
When you call us for a complete axle, we’re not starting from scratch — we’re pulling pre-rebuilt components off the shelf and assembling them to your machine spec. Most ship in 3–4 days.

Most complete axles ship within 3–4 days. Components are already on the shelf — we just assemble to your spec.
Rebuilt finals, rebuilt differentials, and prepped banjo housings ready to go. The axle is just the assembly step.
Every complete axle ships with AT LEAST a one-year warranty.
22 machine models, 124 distinct axle part numbers. If you don’t see your model, call us — we’ve almost certainly done it.
Tell us the model, serial, and axle position. We’ll match the part number, confirm component stock, and quote a build window. Usually 3–4 days, sometimes ready off the shelf.